London and Birmingham Railway
Request this item
- Creator
- London and Birmingham Railway
TitleLondon and Birmingham Railway
Reference codeMS1122
Date1836 February
Scope and ContentDrawing of Tring cutting
NotesTring cutting was the largest of its kind in the early railway era with a length of two and half miles and a depth of 40 feet. A big problem for the engineers of the London and Birmingham Railway was building through the chalk ridge of the Chilterns. The solution was to cut through the bottom of the Bulbourne valley. The cutting was built using "horse runs". Horses at the top of the cutting were harnessed to big barrows by lengths of rope over a pulley. The barrow, when filled with earth, was pulled up a steep plank-way by horses, with navvies in attendance. Any irregular movement of the horse could propel both man and barrow into the cutting. There were some 40 of these horse runs used in the construction work at Tring.
Conditions governing accessOpen for research
Extent1 item
Senate House Library holds other archives, which relate to the London and Birmingham Railway (Refs: MS504, MS940). The Goldsmiths collection at Senate House Library also includes plans for the "Tring" line, circa 1840 (Ref: [G.L.] Case II.7 [Railways Portfolio]). The National Archives, London, holds business records, 1830-1849 and 1833-1877 (Ref: RAIL 384); Salford University Library contains miscellaneous correspondence from directors, 1830; Bristol University Library holds minutes of evidence given before the House of Lords Committee, 1832 (Ref: DM 1528); the National Railway Museum Library and Archive contains drawings of Curzon Street Station, Birmingham, [1838-1840].
Level of descriptionfonds